The Sutton Place Hotel Chicago

 

 

21 East Bellevue Place, Chicago, Illinois  60611

312.266.2100  Fax 312.266.2103

Toll Free Reservations 1.8663.SUTTON (1.866.378.8866)

info_chicago@suttonplace.com

 

   


Book Now

 

More details

Click here for more information

 

Accumulate points for each

dollar spent and earn bonus

points.  Redeem them for unique

gifts & rewards with our Sutton Prestige guest reward program.

---------------------------------------

Manage your account

Track online bookings

Redeem points

Fabulous rewards

 

More details >>

 

In order to keep you informed of upcoming events and promotions at The Sutton Place Hotels, please click on your preferred area of interest in the specific hotel.

Join Now >>

 

How was your stay with us? Did we meet all your expectations? We want your stays at The Sutton Place Hotels to be the best you have experienced anywhere.    You talk, we listen.

Please let us know >>

 

 

 

 

 

 

 1. Corridor Lighting:

Conversion of all lamps in guestroom corridors from 90 watt incandescent

to 15 watt fluorescent lamps and meeting room corridors were converted

from 150 watt incandescent to 23 watt fluorescent lamps.

 

 2. Guestroom lighting:

a)  Desk lamps 90 watt incandescent to 19 watt fluorescent.

b)  Closet lamps 75 watt incandescent to 13 watt fluorescent.

c)  Night stand lamps 90 watt incandescent to 19 watt fluorescent.

 

 3. Guestroom bathrooms:

a)  Converted 4 lamp F40 fluorescent fixtures to 3 lamp energy saving

     T8 fixtures.

b)  Bathtub lighting 90 watt incandescent to 19 watt fluorescent

c)  Installed 15 minute timers on all 250 watt heat lamps. 

 

 4. Guestroom HVAC units:

a)  Installed energy saving T-stat which can be only set from 68 degree

     to 72 degrees preventing over heating or cooling.

b)  Fan unit shuts off when temperature in the room is satisfied, old unit

     constantly ran.

c)  Fan speed no longer runs on high speed. Low and Medium speed only.

 

 5. Back of the house lighting:

Converted all fixtures from F-40 lamps to energy saving T-8s.

 

 6. Corridor Air Handler Unit:

Installed frequency drive unit which runs at 70% 12 months out of the year.

Old unit ran at 100% full capacity 24 hours a day.

 

 7. Meeting room Air Handler Units:

Installed frequency drive units on Supply and Return fan motors. Unit has

run as low as 50% demand when static psi of ductwork is reached. Unit

ran at 100% capacity prior to frequency drive installation. Resulted in

energy savings up to 50%.

 

 8. Laundry equipment:

Installed frequency drive controls on large washers in Laundry.

 

 9. Public areas, meeting rooms, offices and mechanical rooms:

Installed Delta Control System which gives Engineering the ability to control

air temperature throughout hotel without physically needing to go to the

location to make the adjustment. This system has theability to shut down

boilers and other equipment when occupancy is lower saving on natural

gas usage and electricity allowing us to shut down or reduce air

conditioning or heating consumption in areas throughout the hotel in

unoccupied rooms.

 

10. Healthier Choice Carpet Padding. (GREEN LABEL) Approved:

Beginning in December 2007, we will be replacing our Corridor carpeting

and padding. We will be installing Healthier Choice GREEN Hi-Density

Frothed Micro Closed Cell Polyurethane pad instead of the conventional

rubber or fiber padding. Healthier Choice padding is bacteria resistant,

contains no VOCs i.e styrene formaldehyde or 4-PC. This padding has

an R rating of .66, has a 35 UG gas rating. Material cannot give off

more than 600 UG gases to receive the GREEN LABEL. We will be well

below the 600 UG rating.

 

11. Caulking of hotel façade. (3 year project.):

Three year project re-caulking all vertical and horizontal joints of the

exterior. This will ensure the loss of heating or cooling is kept to a

minimal, preventing warm or cool air from entering the building as well as

warm or cool air from escaping the building.

 

12. Recycle all paper, bottles, aluminum and cardboard.

 

13. Donate all discarded mattresses.

 

14. Recycle all cooking oils.

 

15. Sell old furniture to employees before bidding to furniture restorers.

 

16. Installed current limiters on chillers to reduce amp draw at start up and

at full capacity.

 

17. Replaced flood lighting on exterior of building with high psi sodium lighting.

 

18. Recycle bins are located on all guest floors for paper and bottles.

 

19. Convert discarded linen into towels and rags for cleaning, sheets, rugs

and robes given to Salvation Army every quarter.

 

20. Recycle all paper products such as toilet tissue and Kleenex after

every check-out and place them in the employee’s washrooms.

 

21. Implement guest energy conservation program of reusing towels/linens.

 

 

 